Selecting Self-tests to be Performed
Two self-tests can be set, to check whether UDMA Mode can be upgraded, and whether SMART thresholds have been exceeded. (For more information about these self-tests, see the 3DM Reference section, Scheduling Page.)
Initially, these tests are set to run every 24 hours. You can change the schedule for when they are run, and you can disable the tests, if you prefer not have to have them performed.
Note: These tasks will only be run during scheduled times if they are checked in the Schedule Self-tests section of the Scheduling page. If neither of the tasks is checked, self-tests will never run, even if you have scheduled time slots set.To select self-tests to be performed
- Choose Management > Schedule from the menu bar.
The Scheduling Page appears, showing the schedule for Rebuild Tasks.
- Select Self-test Tasks from the drop-down list at the top of the page.
- Check the boxes next to the self-tests you want to be performed.
To disable self-tests
Unlike scheduling of rebuilds and verifies, scheduling of self-tests is always enabled.
To disable self-tests you must either remove all schedule times, or uncheck the tests listed in the Tasks column.
AMCC www.3ware.com Direct:(408) 542-8800 Toll Free: (800) 840-6055 email: 3waresupport@amcc.com |
Copyright (c) 2004-2006, AMCC |